This email address is being protected from spambots. You need JavaScript enabled to view it.

https://www.spatii-de-birouri.ro/images/osproperty/properties/136/medium/13614942528081.jpg" AFI TECH PARK Sos.Progresului, Central, Bucharest +40 21 408 0300 https://www.spatii-de-birouri.ro/images/logo/spatii-de-birouri-logo.png

Offices for rent in central Bucharest

AFI TECH PARK

Progresului Road, Central, Bucharest
  • AFI TECH PARK închirieri spații birouri București zona centrală vedere de ansamblu
  • AFI TECH PARK spații birouri centru București proiecție fațadă
  • AFI TECH PARK birou de închiriat București central fotografie exterioară
  • AFI TECH PARK spațiu de birouri zona centrală perspectivă încadrare în zonă
  • AFI TECH PARK birouri de închiriat centru sos Progresului interior
  • AFI TECH PARK spații de birouri București centru plan
  • AFI TECH PARK închirieri spații birouri București zona centrală vedere de ansamblu
  • AFI TECH PARK spații birouri centru București proiecție fațadă
  • AFI TECH PARK birou de închiriat București central fotografie exterioară
  • AFI TECH PARK spațiu de birouri zona centrală perspectivă încadrare în zonă
  • AFI TECH PARK birouri de închiriat centru sos Progresului interior
  • AFI TECH PARK spații de birouri București centru plan
Updated: 19-06-2018
TERMS OF LEASE
NO FEE REQUIRED FROM TENANT
THE AGENT REPRESENTS THE OWNER
  • Available min: 800 m²
  • Available max: 16.000 m²
  • Basic rent: la cerere / on demand
  • Availability : Q2 / 2018

AFI TECH Park is one of the main office projects under planning in the central area of Bucharest. The park is located in between Tudor Vladimirescu Boulevard and Progresului Road, across of the retail park Vulcan Value Center.

The park is placed at 2 km from Unirii Square and 1.4 km from the future metro station Academiei. It benefits from an easy access to George Cosbus Square and the junction with Calea 13 Septembrie, from where there is a direct connection with Unirii Square, Bucharest’s ground zero.

The public transport infrastructure includes tram stop (5 lines) in front of the park on Progresului Road, shuttle-bus line, respectively buses and trams in walking distance (G.Cosbus Square, Calea 13 Septembrie) with links to the metro stations.

AFI TECH Park includes 3 buildings of A-class standards, having 8-14 floors and a total of 56,000 sq m GLA.

The first phase will deliver a building of 2U+GF+8 with 22,000 sq m GLA.

  • Status: under construction
  • Year of completion: T2 2018
  • Floors: 2S+P+8
  • GLA: 22.000 m²
  • GLA / Floor: 2.700 m²
  • Parking (spaces): 220
Facilities
Retail/Shopping Area
Reception Services
Own parking lot
Bike parking
Coffee Shop
Restaurant
Technical Specs
BMS - Building Management System
HVAC
Raised Floor
Suspended Ceiling
Clear floor height of more than 2.7 m
Security guard 24/7
Elevator/s
Cable Internet
Smoke/Heat Detectors
Sprinkler System
Carpeting

Contact


Related properties

Green Gate
LEASE

Green Gate

București, Central
min 200 - max 3.000 m²
TATI Center
LEASE

TATI Center

București, Central
min 530 - max 7.081 m²
THE GRAND OFFICES
LEASE

THE GRAND OFFICES

București, Central
min 32 - max 60 m²
Forum III
LEASE

Forum III

București, Central
0 m²
IZVOR 80
LEASE

IZVOR 80

București, Central
0 m²
Elefterie 18
LEASE

Elefterie 18

București, Central
0 m²